Bent Flyvbjerg studied more than 16,000 big projects.

Bent Flyvbjerg studied more than 16,000 big projects.

8.5% hit time and budget.
0.5% hit time, budget and the promised benefits.

His rule: think slow, act fast.

Most projects do the opposite. They rush the plan, then get stuck in delivery, where every change is slow and expensive.

Plan slowly and cheaply: models, simulations, prototypes. Changing a drawing costs almost nothing. Changing steel costs a fortune.

Then build fast. The longer delivery takes, the more can go wrong. Source: Flyvbjerg and Gardner, How Big Things Get Done.

Read the playbookThink slow, act fast